Fujitsu SPARC T5440 Bedienungsanleitung Seite 179

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 214
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 178
Returning the Server to Operation 153
Connect the Power Cords to the Server
Reconnect both power cords to the power supplies.
Note As soon as the power cords are connected, standby power is applied.
Depending on the configuration of the firmware, the system might boot. See the
SPARC Enterprise T5440 Server Administration Guide for configuration and power-on
information.
Power On the Server
To power on the server, do one of the following:
To initiate the power-on sequence from the service processor prompt, issue the
poweron command.
You will see an -> Alert message on the system console. This message
indicates that the system is reset. You will also see a message indicating that the
VCORE has been margined up to the value specified in the default.scr file
that was previously configured.
Example:
To initiate the power-on sequence manually, use a pen or pencil to press the
Power button on the front panel. See “Front Panel Diagram” on page 3 for
Power button location.
Note If you are powering on the server following an emergency shutdown
triggered by the top cover interlock switch, you must use the poweron command.
-> start /SYS
Seitenansicht 178
1 2 ... 174 175 176 177 178 179 180 181 182 183 184 ... 213 214

Kommentare zu diesen Handbüchern

Keine Kommentare