viii SPARC Enterprise T1000 Server Installation Guide • April 2007
ixFiguresFIGURE 1-1 Server 2FIGURE 1-2 Slide Rail Assembly 5FIGURE 1-3 Mounting Bracket Locks 6FIGURE 1-4 Cable Management Bracket 7FIGURE 1-5 Locatio
x SPARC Enterprise T1000 Server Installation Guide • April 2007
xiTablesTABLE 1-1 Ethernet Connection Transfer Rates 9TABLE 3-1 Server Device List 38
xii SPARC Enterprise T1000 Server Installation Guide • April 2007
xiiiCode SamplesCODE EXAMPLE 3-1 Boot Sequence Example 28CODE EXAMPLE 3-2 Example of Normal System Initialization Output 37CODE EXAMPLE 3-3 Example of
xiv SPARC Enterprise T1000 Server Installation Guide • April 2007
xvPrefaceThis guide provides instructions, background information, and reference material tohelp you install the SPARC Enterprise T1000 Server.Instruc
xvi SPARC Enterprise T1000 Server Installation Guide • April 2007Structure and Contents of This ManualThis manual is organized as described below: CH
Preface xviihttp://primeserver.fujitsu.com/sparcenterprise/manual/Note – Product Notes are available on the website only. Please check for the recent
xviii SPARC Enterprise T1000 Server Installation Guide • April 2007Using UNIX CommandsThis document might not contain information about basic UNIX® co
Preface xixPrompt NotationsThe following prompt notations are used in this manual.Conventions for Alert MessagesThis manual uses the following convent
xx SPARC Enterprise T1000 Server Installation Guide • April 2007Alert messages in the textAn alert message in the text consists of a signal indicating
Preface xxiProduct HandlingMaintenanceWarning – Certain tasks in this manual should only be performed by a certifiedservice engineer. User must not pe
xxii SPARC Enterprise T1000 Server Installation Guide • April 2007Alert LabelsThe followings are labels attached to this product: Never peel off the
Preface xxiiiReader's Comment Form
xxiv SPARC Enterprise T1000 Server Installation Guide • April 2007FOLD AND TAPEFOLD AND TAPEBUSINESS REPLY MAILFIRST-CLASS MAIL PERMIT NO 741 SUNNYV
1CHAPTER1Preparing for InstallationThis chapter describes the server installation, and provides background informationabout the installation procedure
2 SPARC Enterprise T1000 Server Installation Guide • April 2007Server OverviewFIGURE 1-1 shows the server.FIGURE 1-1 ServerTools Needed No. 2 Phillip
Chapter 1 Preparing for Installation 3Optional ComponentsThe standard components of the server are installed at the factory. However, if youordered op
SPARC®Enterprise T1000 ServerInstallation GuideManual Code : C120-E383-01ENPart No. 875-4021-10April 2007
4 SPARC Enterprise T1000 Server Installation Guide • April 20074. Mount the server into a rack or equipment cabinet. See “To Install the Server inthe
Chapter 1 Preparing for Installation 5The Solaris OS is preinstalled on the server. When you power on, you areautomatically guided through the Solaris
6 SPARC Enterprise T1000 Server Installation Guide • April 2007The slide rail assembly has the following features: The front and rear sections form t
Chapter 1 Preparing for Installation 7Cable Management NotesA cable management bracket (FIGURE 1-4) is included in the server slide rail kit. Thecable
8 SPARC Enterprise T1000 Server Installation Guide • April 2007Data Port and Cabling NotesPort LocationsFIGURE 1-5 shows the ports on the server.FIGUR
Chapter 1 Preparing for Installation 9 Ethernet ports. The server Ethernet interfaces operate at 10 Mbps, 100 Mbps, and1000 Mbps. The transfer rates
10 SPARC Enterprise T1000 Server Installation Guide • April 2007
11CHAPTER2Installing the ServerThis chapter provides instructions for installing the server in an equipment rack.This chapter contains the following s
12 SPARC Enterprise T1000 Server Installation Guide • April 2007Installing the Server in a Rack▼ To Install the Mounting Brackets1. Pull both mounting
Chapter 2 Installing the Server 13FIGURE 2-2 Mounting Bracket Release Button2. Attach a mounting bracket to the right side of the server chassis.a. Po
Copyright 2007 Sun Microsystems, Inc., 4150 Network Circle, Santa Clara, California 95054, U.S.A. All rights reserved.FUJITSU LIMITED provided technic
14 SPARC Enterprise T1000 Server Installation Guide • April 2007FIGURE 2-3 Attaching a Mounting Bracket to the Chassisb. With the heads of the two loc
Chapter 2 Installing the Server 15▼ To Install the Slide Rails1. Determine which rack hole numbers you will use when attaching the slide rails tothe r
16 SPARC Enterprise T1000 Server Installation Guide • April 20074. Determine if the slide rails require an extension bracket.Most rack installations d
Chapter 2 Installing the Server 175. Attach a slide rail to the right front rack post (FIGURE 2-6).a. Loosely attach the front of a slide rail to the
18 SPARC Enterprise T1000 Server Installation Guide • April 2007a. At the rear of the rack, insert the left side of the tool into slots at the end of
Chapter 2 Installing the Server 19e. At the front of the rack, use the spacing tool to adjust the distance between thefront ends of the rails.The fron
20 SPARC Enterprise T1000 Server Installation Guide • April 20072. Raise the server and insert the ends of the mounting brackets into the left andrigh
Chapter 2 Installing the Server 21Note – When you attach cables to the server, as in the following procedures, lay thecables over the cable management
22 SPARC Enterprise T1000 Server Installation Guide • April 2007▼ To Connect the SC Serial Management PortThe system controller serial management port
Chapter 2 Installing the Server 23▼ To Connect the Ethernet Network CablesThe server has four network connectors, marked NET0, NET1, NET2, and NET3(FI
Copyright 2007 Sun Microsystems, Inc., 4150 Network Circle, Santa Clara, California 95054, Etats-Unis. Tous droits réservés.Entrée et revue tecnical f
24 SPARC Enterprise T1000 Server Installation Guide • April 2007Caution – The server goes into Standby mode and the system controller initializesas so
25CHAPTER3Powering On the SystemThis chapter includes instructions for booting the server and for enabling the systemcontroller network management por
26 SPARC Enterprise T1000 Server Installation Guide • April 2007Note – To see these status and error messages, connect a terminal or terminalemulator
Chapter 3 Powering On the System 27▼ To Power On the System for the First TimeTip – The serial terminal or a terminal emulator should be connected bef
28 SPARC Enterprise T1000 Server Installation Guide • April 2007After the system controller boots, the system controller login prompt is displayed ont
Chapter 3 Powering On the System 29Note – If it receives no user input within 60 seconds, the ALOM CMT systemcontroller console automatically connects
30 SPARC Enterprise T1000 Server Installation Guide • April 20071. If this is the first time the system has been powered on, use the passwordcommand t
Chapter 3 Powering On the System 31Note – If you are unable to use DHCP and SSH on your network, you must connectto the ALOM CMT system controller usi
32 SPARC Enterprise T1000 Server Installation Guide • April 2007You set these network parameters according to the specific details of your networkconf
Chapter 3 Powering On the System 33a. Set the IP address for the system controller.b. Set the IP address for the system controller gateway.c. Set the
34 SPARC Enterprise T1000 Server Installation Guide • April 2007Note – After setting the configuration parameters, you must reset the systemcontroller
Chapter 3 Powering On the System 35Using the ALOM CMT SystemController for Common OperationsNote – For more information on using ALOM CMT, refer to th
36 SPARC Enterprise T1000 Server Installation Guide • April 2007▼ To Initiate the Power On SequencePowering on the system requires you to use the powe
Chapter 3 Powering On the System 37▼ To Perform a Normal System InitializationAfter you issue the poweron command, the CPU and memory controllers init
38 SPARC Enterprise T1000 Server Installation Guide • April 2007For additional tests and to verify system functionality, see the SPARC EnterpriseT1000
Chapter 3 Powering On the System 39Booting the Solaris Operating SystemThe Solaris OS is preinstalled on the disk drive (for server configurations tha
40 SPARC Enterprise T1000 Server Installation Guide • April 2007▼ (Optional) To Reset the System● If it is necessary to reset the system, use the init
Chapter 3 Powering On the System 414. Type the poweron command.5. Reconnect to the system console using the console command.The systems displays vario
42 SPARC Enterprise T1000 Server Installation Guide • April 2007
43APPENDIXAUpdating the Server FirmwareThis appendix describes how to update the server firmware.This appendix includes the following topics: Flash I
vContentsPreface xv1. Preparing for Installation 1Server Overview 2Tools Needed 2Optional Components 3Installation Overview 3Slide Rail Assembly Notes
44 SPARC Enterprise T1000 Server Installation Guide • April 2007▼ To Update the Firmware1. Ensure that the ALOM CMT system controller network managem
Appendix A Updating the Server Firmware 45 -v is the flag to turn on verbose message output5. Reset the system controller.After the flash has been up
46 SPARC Enterprise T1000 Server Installation Guide • April 2007...ETHERNET CPU LOOPBACK TEST, PASSEDFull VxDiag Tests - PASSED Status summary -
47APPENDIXBSelecting a Boot DeviceThe boot device is specified by the setting of an OpenBoot configuration variablecalled boot-device. The default set
48 SPARC Enterprise T1000 Server Installation Guide • April 2007 disk – Specifies the system boot disk (internal disk 0 by default) disk0 – Specifi
49APPENDIXCConfiguring the NetworkManagement PortIf your server uses system firmware 6.2 or subsequent compatible versions, do notperform the followin
50 SPARC Enterprise T1000 Server Installation Guide • April 2007 netsc_ipnetmask – Netmask for the system controller subnetNote – For more informati
Appendix C Configuring the Network Management Port 51Note – The network addresses and parameters shown in the examples are forillustration purposes on
52 SPARC Enterprise T1000 Server Installation Guide • April 2007
53IndexSymbols#., system console escape sequence, 40AAC power cable, 9AC power, system controller, 4adapters for serial cables, 22adjusting length of
vi SPARC Enterprise T1000 Server Installation Guide • April 2007▼ To Install the Cable Management Bracket 20Removing the Server From the Rack for Serv
54 SPARC Enterprise T1000 Server Installation Guide • April 2007Hhandshaking setting for terminal, 27hardware options, installing, 3host firmware updat
Index 55switching to the SC console, #. escape sequence, 40system console, reconnecting to, 41system controllerconfiguring settings, 31, 49connecting t
56 SPARC Enterprise T1000 Server Installation Guide • April 2007
Contents vii▼ To Power Cycle the System 40A. Updating the Server Firmware 43Flash Image Overview 43Updating the Firmware 43▼ To Update the Firmware 44
Kommentare zu diesen Handbüchern